Stormwater Upgrade: Brecon Road to Achilles Street
Works Scope:Stormwater reticulation works, construction and refurbishment of manholes, reinstatement works and project documentation activities including:
- Supply and Installation of DN300 mm Ø uPVC rubber ringed pipes
- Supply and installation of DN1080 mm Ø concrete manholes
- Manhole connections
- Earthworks
- Stormwater reticulation miscellaneous works
- Saw-cutting of pavement and concrete footpath
- Breaking into existing DN1080 mm Ø manholes
- Reinstatement of grassed areas, concrete footpath, kerb and channel, road carriageway, vegetation, gardens and trees
- Backfilling with imported materials
- As-built documentation
- As-built surveying
- Temporary conveyance of stormwater
- Demolition and site clearance
- Pre- and Post-Construction condition surveys
- Ground Penetrating Radar testing
- Temporary Traffic Management
- Pre-start site photo/video survey
- Silt control
Project Information
- Location:Stratford
- Client:Stratford District Council
- Construction Period:2 Months
- StatusCompleted