Safety Improvement River/Lake RD Roundabout
Works Scope:The River/Lake Road Roundabout project focuses on the installation and improvement of stormwater and water supply infrastructure. The scope includes the construction of stormwater components such as pipes, manholes, swales, wingwalls, catchpits, and miscellaneous fittings, as well as the removal and installation of water supply elements.
- Installation of the RCRRJ Class 4 pipes
- Installation of manholes with a diameter of 1050mm, extending up to 2.0m
- Implementation of a vegetated stormwater swale for effective water management.
- Installing of 600 series wingwalls with riprap and geofabric.
- Installation of 675 x 450 catchpits for efficient stormwater collection
- Safe removal of the existing water valve
- Installation of Medium-Density Polyethylene (MDPE) water supply pipe with a diameter of 63mm.
- Installation of a new sluice water valve housed in a surface box.
Project Information
- Location:River/Lake Road
- Client:Waikato District Alliance
- Construction Period:1 Months
- StatusCompleted