Fairfield Pump Station Emergency Storage
Works Scope:The Fairfield Pump Station Emergency Storage project focuses on the establishment of emergency storage facilities and related stormwater works. The project is divided into several key components, encompassing preliminary and general activities, as well as stormwater infrastructure improvements.
- Laying DN 375 Concrete SW Redirection Route
- Installation of 1050mm diameter stormwater manholes.
- Connection to existing stormwater service.
Project Information
- Location:River Road, Fairfield
- Client:HEB Construction
- Construction Period:1 Months
- StatusCompleted